重型工业机械厂搬迁

Executing a complex, zero-downtime relocation of a 5,000-tonne heavy industrial manufacturing facility from Japan to Malaysia.

Heavy Machinery OEM

背景

To expand production capacity, a heavy machinery OEM needed to relocate its entire manufacturing plant—including 450 heavy stamping presses and automated assembly lines—from Penang to a new industrial park in Kedah. The primary challenge was executing the massive move without shutting down ongoing customer production schedules or damaging sensitive precision tooling.

LOGISTEED delivered a complete turnkey factory relocation service. LOGISTEED engineers executed match-marking, electrical decommissioning, mechanical dismantling, heavy rigging using 400-ton hydraulic gantries, vacuum crating, and precision laser alignment at the new facility during weekend shutdown windows.

LOGISTEED 如何提供帮助的总结:

  • Zero Production Interruption: Relocated all 450 machinery units seamlessly without interrupting critical production output.
  • Early Project Completion: Handed over the operational plant 5 days ahead of the master timeline.
  • Precision Re-installation: Re-anchored and leveled all heavy assembly lines with zero recalibration or alignment errors.

项目范围

项目范围

LOGISTEED delivered complete factory turnkey relocation services including electrical decommissioning, mechanical dismantling, heavy transport, and precision leveling at the new site.

Scope of work included:

  • Laser-tracker alignment and match-marking of complex automated assembly lines
  • Heavy rigging using hydraulic gantry systems and 200-ton mobile cranes
  • Custom wooden crating and vacuum packaging for overseas sensitive tooling
Logisteed Plant Relocation Featured Image

挑战

Moving heavy stamping presses weighing up to 90 tons required strict floor load management and specialized transport permits along public highways.

The plant relocation had to occur in synchronized phases to allow ongoing manufacturing of critical customer orders without stopping production.

最终结果: 重型工业机械厂搬迁

LOGISTEED 的定制解决方案

LOGISTEED engineers created a phased modular relocation schedule, executing machine moves during planned weekend shutdown windows.

Tailored solutions provided:

  • Deployment of 400-ton hydraulic gantry systems for tight indoor overhead lifts
  • Vibration-isolated transport trailers preventing optical sensor misalignment
  • Turnkey re-anchoring, precision leveling, and utility reconnection testing
我们的服务

为您的行业量身定制的物流方案。.

我们将精密工程技术与专业运营基础设施相结合,以优化五大核心全球行业的供应链。.

成功案例

数据驱动型工程。经实践验证的运营成功案例。.

了解我们如何将深厚的日本工程技术与先进的数字孪生分析相结合,以解决全球复杂的供应链挑战。.

Logisteed Automotive Featured Image

泰国面向日本汽车售后市场的自动化零部件中心

部署高位货架自动化立体仓库机器人来管理超过 15 万种汽车售后市场 SKU。.
Logisteed Green Sustainable Logistics Featured Image

消费品绿色供应链及车队优化

为全球快速消费品分销实施电动汽车车队、多式联运铁路运输以及 ESG 碳排放跟踪。.
Logisteed Project Cargo Solutions Featured Image

东南亚跨境重型项目货物运输

电力基础设施的多式联运重型吊装工程和跨境路线勘测。.