{"id":9622,"date":"2026-08-11T05:53:18","date_gmt":"2026-08-11T05:53:18","guid":{"rendered":"https:\/\/logisteed.web-preview.io\/success-story\/cross-border-heavy-project-cargo-sea\/"},"modified":"2026-08-11T06:23:35","modified_gmt":"2026-08-11T06:23:35","slug":"cross-border-heavy-project-cargo-sea","status":"publish","type":"success-story","link":"https:\/\/logisteed.web-preview.io\/zh\/success-story\/cross-border-heavy-project-cargo-sea\/","title":{"rendered":"\u4e1c\u5357\u4e9a\u8de8\u5883\u91cd\u578b\u9879\u76ee\u8d27\u7269\u8fd0\u8f93"},"content":{"rendered":"<p>An energy infrastructure developer required the transport of massive gas turbine power plant modules from manufacturing sites in Thailand to installation locations in Vietnam and Indonesia.<\/p>\n<p>LOGISTEED managed end-to-end multimodal transport utilizing specialized heavy-haul barges, low-bed multi-axle trailers, and customs clearance protocols across borders.<\/p>","protected":false},"featured_media":9390,"template":"","meta":{"_acf_changed":false},"region":[59],"industry_tax":[45],"country_tax":[51,49,50],"solution_tax":[56],"class_list":["post-9622","success-story","type-success-story","status-publish","has-post-thumbnail","hentry","region-apac","industry_tax-industrial-heavy-equipment","country_tax-indonesia","country_tax-thailand","country_tax-vietnam","solution_tax-cross-border-transport"],"acf":{"intro":"Multimodal heavy-lift engineering and cross-border route survey for power generation infrastructure.","client_name":"Energy Infrastructure Developer","background_story":"<p>The client was tasked with constructing a major power generation facility in Southeast Asia, requiring the transport of eight oversized gas turbine power plant modules from manufacturing facilities in Thailand to remote coastal project sites in Vietnam and Indonesia. Weighing up to 180 metric tons each, the cargo exceeded standard road load capacities and required navigating restrictive shallow riverways during seasonal monsoon fluctuations.<\/p>\n\n<p>LOGISTEED\u2019s specialized project cargo team delivered a turnkey multimodal logistics solution. Utilizing shallow-draft heavy barges equipped with active ballasting systems, multi-axle Self-Propelled Modular Transporters (SPMTs), and temporary modular bridge reinforcements, LOGISTEED safely maneuvered the super-heavy components from port to foundation pad.<\/p>\n\n<p><strong>Summary of How LOGISTEED Helped:<\/strong><\/p>\n<ul>\n<li><strong>Ahead-of-Schedule Delivery:<\/strong> Completed the complex 1,200-metric-ton heavy-lift move 14 days ahead of the master construction schedule.<\/li>\n<li><strong>Zero Safety Incidents:<\/strong> Executed all river barging and heavy rigging with zero Lost Time Injuries (LTI).<\/li>\n<li><strong>Customs & Route Engineering:<\/strong> Secured cross-border green-channel customs clearances and reinforced civil infrastructure along transport corridors.<\/li>\n<\/ul>","project_scope":"<p>The multi-country logistics scope involved comprehensive route engineering, heavy-lift sea barging, specialized hydraulic trailer road transport, and complex multi-agency customs clearances.<\/p><p>Comprehensive scope of operations:<\/p><ul><li>Detailed bathymetric river surveys and bridge load capacity calculations<\/li><li>Custom fabrication of heavy-haul marine sea-fastening cradles<\/li><li>Multi-axle hydraulic platform trailers (SPMT) for port-to-site transit<\/li><li>Full customs duty management and cross-border escort permits<\/li><\/ul>","challenges":"<p>Navigating oversized turbines weighing up to 180 tons each through shallow riverways during seasonal monsoon changes posed extreme navigational and structural risks.<\/p><p>Furthermore, restrictive road clearances, low-hanging overhead utility lines, and strict multi-national border inspection delays threatened project deadlines.<\/p>","tailored_solutions":"<p>LOGISTEED project engineers developed bespoke transport solutions including shallow-draft heavy barges equipped with ballasting systems to overcome shallow river passages.<\/p><p>Tailored solutions provided:<\/p><ul><li>Pre-cleared green-channel customs protocols established with port authorities<\/li><li>Temporary modular bridge reinforcements deployed along civil road corridors<\/li><li>24\/7 satellite GPS tracking and structural strain telemetry monitoring<\/li><\/ul>","gallery":[9390,9384,9382,42,9389]},"_links":{"self":[{"href":"https:\/\/logisteed.web-preview.io\/zh\/wp-json\/wp\/v2\/success-story\/9622","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/logisteed.web-preview.io\/zh\/wp-json\/wp\/v2\/success-story"}],"about":[{"href":"https:\/\/logisteed.web-preview.io\/zh\/wp-json\/wp\/v2\/types\/success-story"}],"acf:attachment":[{"embeddable":true,"href":"https:\/\/logisteed.web-preview.io\/zh\/wp-json\/wp\/v2\/media\/9389"},{"embeddable":true,"href":"https:\/\/logisteed.web-preview.io\/zh\/wp-json\/wp\/v2\/media\/42"},{"embeddable":true,"href":"https:\/\/logisteed.web-preview.io\/zh\/wp-json\/wp\/v2\/media\/9382"},{"embeddable":true,"href":"https:\/\/logisteed.web-preview.io\/zh\/wp-json\/wp\/v2\/media\/9384"},{"embeddable":true,"href":"https:\/\/logisteed.web-preview.io\/zh\/wp-json\/wp\/v2\/media\/9390"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/logisteed.web-preview.io\/zh\/wp-json\/wp\/v2\/media\/9390"}],"wp:attachment":[{"href":"https:\/\/logisteed.web-preview.io\/zh\/wp-json\/wp\/v2\/media?parent=9622"}],"wp:term":[{"taxonomy":"region","embeddable":true,"href":"https:\/\/logisteed.web-preview.io\/zh\/wp-json\/wp\/v2\/region?post=9622"},{"taxonomy":"industry_tax","embeddable":true,"href":"https:\/\/logisteed.web-preview.io\/zh\/wp-json\/wp\/v2\/industry_tax?post=9622"},{"taxonomy":"country_tax","embeddable":true,"href":"https:\/\/logisteed.web-preview.io\/zh\/wp-json\/wp\/v2\/country_tax?post=9622"},{"taxonomy":"solution_tax","embeddable":true,"href":"https:\/\/logisteed.web-preview.io\/zh\/wp-json\/wp\/v2\/solution_tax?post=9622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}